McMillan & McMillanPainting Contractors · Las VegasCall John

Homeowner guides

A little reading for your next repaint.

Use these short guides to talk through your home, the preparation and your color questions.

Discuss your free estimate
Completed exterior with an arched entry.
Completed exterior with an arched entry.

Homeowner reading · 1

Which walls, trim and repairs belong in the estimate?

Stucco, wood trim and the way your home meets the street.

  1. Wash & dry

    Power washing is followed by proper dry time.

  2. Protect

    Patios, windows, walkways and roofing areas are masked.

  3. Repair the surface

    Stucco damage is repaired and retextured; wood is sanded or replaced where needed.

  4. Prime & caulk

    Wood trim and rusted iron are primed. Cracks, window frames, joints and openings receive repairs and caulk.

  5. Apply the finish

    Acrylics, enamels and elastomeric coatings are applied by airless spray, brush and roll.

  6. Clean & inspect

    The work ends with complete cleanup and a final inspection.

Explore exterior painting ↗
Finished two-tone stucco home with a stacked-stone wall.
Finished two-tone stucco home with a stacked-stone wall.

Homeowner reading · 2

What stays in the room, and what needs a new finish?

A new wall color has to live with everything you already love.

  1. Protect what stays

    Fixtures, flooring, carpet, cabinets and windows are fully masked.

  2. Repair walls

    Drywall repairs, retexturing, hairline cracks and sheetrock damage are part of the published scope.

  3. Attend to the edges

    Baseboards, windows, nail holes and door frames receive repair and caulking.

  4. Choose color & sheen

    The scheme considers carpet, cabinets, tile, countertops and furniture. Washable finishes range from flat to gloss.

  5. Finish & put back

    Painting is followed by cleanup and inspection. The business states that the home is arranged as it was.

Explore interior painting ↗
Finished interior: painted walls, white trim and stair detailing.
Finished interior: painted walls, white trim and stair detailing.

Homeowner reading · 3

What should the new colors work with?

Begin with the floor, the furniture and the light in your room.

  1. Gather the context

    Interior schemes consider carpet, cabinets, tile flooring, countertops and furniture.

  2. Look at samples

    The business uses samples and charts from major paint companies.

  3. Choose your scheme

    The homeowner’s choice is part of the color conversation.

  4. Discuss approval

    Ask about HOA and ARC assistance before exterior work. Approval remains with the relevant association.

Explore color consultations ↗
Finished living room with painted walls, fireplace and white shutters.
Finished living room with painted walls, fireplace and white shutters.

Homeowner reading · 4

Are you asking about an inspection, maintenance or replacement?

The roof has its own story beneath the tile.

  1. Ridge preparation

    The first named stage in the business’s tile-roof sequence.

  2. Underlayment removal

    Existing underlayment is addressed in the next published stage.

  3. Sheathing inspection & repair

    The exposed sheathing is inspected and repaired.

  4. Final installation

    The sequence ends with the final tile installation.

Explore roofing ↗
Completed tile roof from the business’s roofing sequence.
Completed tile roof from the business’s roofing sequence.

Free estimate & consultation

Tell the family about your home.

Speak with John or David. Monday–Saturday, 7am–7pm.

Discuss your free estimate
Completed exterior with brown garage doors.
Completed exterior with brown garage doors.

Open original ↗