McMillan & McMillanPainting Contractors · Las VegasCall John
Completed exterior with an arched entry.

Homeowner guides

Four guides for a better project brief.

Use these short guides to talk through your home, the preparation and your color questions.

Plan a free estimate
Completed exterior with an arched entry.

Discussion checklist · 1

Exterior painting

  • Which elevations and trim need painting?
  • Where have you noticed cracks or wood damage?
  • Does your community require color approval?
Read the full scope ↗
  1. Wash & dry

    Power washing is followed by proper dry time.

  2. Protect

    Patios, windows, walkways and roofing areas are masked.

  3. Repair the surface

    Stucco damage is repaired and retextured; wood is sanded or replaced where needed.

  4. Prime & caulk

    Wood trim and rusted iron are primed. Cracks, window frames, joints and openings receive repairs and caulk.

  5. Apply the finish

    Acrylics, enamels and elastomeric coatings are applied by airless spray, brush and roll.

  6. Clean & inspect

    The work ends with complete cleanup and a final inspection.

Discussion checklist · 2

Interior painting

  • Which rooms, walls and trim are included?
  • What furniture, flooring and cabinetry will remain?
  • Are there cracks or damaged drywall to discuss?
Read the full scope ↗
  1. Protect what stays

    Fixtures, flooring, carpet, cabinets and windows are fully masked.

  2. Repair walls

    Drywall repairs, retexturing, hairline cracks and sheetrock damage are part of the published scope.

  3. Attend to the edges

    Baseboards, windows, nail holes and door frames receive repair and caulking.

  4. Choose color & sheen

    The scheme considers carpet, cabinets, tile, countertops and furniture. Washable finishes range from flat to gloss.

  5. Finish & put back

    Painting is followed by cleanup and inspection. The business states that the home is arranged as it was.

Discussion checklist · 3

Color consultations

  • What furnishings and fixed finishes will remain?
  • Do you have preferred colors or sample ideas?
  • Are there HOA or ARC requirements to review?
Read the full scope ↗
  1. Gather the context

    Interior schemes consider carpet, cabinets, tile flooring, countertops and furniture.

  2. Look at samples

    The business uses samples and charts from major paint companies.

  3. Choose your scheme

    The homeowner’s choice is part of the color conversation.

  4. Discuss approval

    Ask about HOA and ARC assistance before exterior work. Approval remains with the relevant association.

Discussion checklist · 4

Roofing

  • What roof issue have you noticed?
  • Are there water stains inside the property?
  • Is the conversation about maintenance, inspection or replacement?
Read the full scope ↗
  1. Ridge preparation

    The first named stage in the business’s tile-roof sequence.

  2. Underlayment removal

    Existing underlayment is addressed in the next published stage.

  3. Sheathing inspection & repair

    The exposed sheathing is inspected and repaired.

  4. Final installation

    The sequence ends with the final tile installation.

Free estimate & consultation

A clear scope starts with a conversation.

Speak with John or David. Monday–Saturday, 7am–7pm.

Discuss your free estimate
Completed exterior with brown garage doors.
Completed exterior with brown garage doors.

Open original ↗