McMillan & McMillanPainting Contractors · Las VegasCall John

Homeowner guides

Understand what comes before the coat.

Use these short guides to talk through your home, the preparation and your color questions.

Discuss your free estimate
Completed exterior with an arched entry.
Completed exterior with an arched entry.
Finished two-tone stucco home with a stacked-stone wall.
Finished two-tone stucco home with a stacked-stone wall.

The working sequence · 1

Exterior painting

  1. Wash & dry

    Power washing is followed by proper dry time.

  2. Protect

    Patios, windows, walkways and roofing areas are masked.

  3. Repair the surface

    Stucco damage is repaired and retextured; wood is sanded or replaced where needed.

  4. Prime & caulk

    Wood trim and rusted iron are primed. Cracks, window frames, joints and openings receive repairs and caulk.

  5. Apply the finish

    Acrylics, enamels and elastomeric coatings are applied by airless spray, brush and roll.

  6. Clean & inspect

    The work ends with complete cleanup and a final inspection.

Follow this service story ↗
Finished interior: painted walls, white trim and stair detailing.
Finished interior: painted walls, white trim and stair detailing.

The working sequence · 2

Interior painting

  1. Protect what stays

    Fixtures, flooring, carpet, cabinets and windows are fully masked.

  2. Repair walls

    Drywall repairs, retexturing, hairline cracks and sheetrock damage are part of the published scope.

  3. Attend to the edges

    Baseboards, windows, nail holes and door frames receive repair and caulking.

  4. Choose color & sheen

    The scheme considers carpet, cabinets, tile, countertops and furniture. Washable finishes range from flat to gloss.

  5. Finish & put back

    Painting is followed by cleanup and inspection. The business states that the home is arranged as it was.

Follow this service story ↗
Finished living room with painted walls, fireplace and white shutters.
Finished living room with painted walls, fireplace and white shutters.

The working sequence · 3

Color consultations

  1. Gather the context

    Interior schemes consider carpet, cabinets, tile flooring, countertops and furniture.

  2. Look at samples

    The business uses samples and charts from major paint companies.

  3. Choose your scheme

    The homeowner’s choice is part of the color conversation.

  4. Discuss approval

    Ask about HOA and ARC assistance before exterior work. Approval remains with the relevant association.

Follow this service story ↗
Completed tile roof from the business’s roofing sequence.
Completed tile roof from the business’s roofing sequence.

The working sequence · 4

Roofing

  1. Ridge preparation

    The first named stage in the business’s tile-roof sequence.

  2. Underlayment removal

    Existing underlayment is addressed in the next published stage.

  3. Sheathing inspection & repair

    The exposed sheathing is inspected and repaired.

  4. Final installation

    The sequence ends with the final tile installation.

Follow this service story ↗

Free estimate & consultation

Ask what goes beneath your finish.

Speak with John or David. Monday–Saturday, 7am–7pm.

Discuss your free estimate
Completed exterior with brown garage doors.
Completed exterior with brown garage doors.

Open original ↗